Access Network

MTS has an expert Implementation team to implement various Access Network Components of various vendors according to the customer’s plan and maintain all security and safety issues. All these teams can perform the installation and commissioning of the Access Network Components and can make sure about the customer’s timeline and Quality issues. At MTS we have survey teams also to perform the various surveys needed to plan, design, and optimize the sites of Access Network. Also we have survey teams also to perform the various surveys needed to plan, design and optimize the sites of Access Network

RF Survey 

Pre-Installation Survey 

Technical Site Survey

Optimization Survey 

Line of Site (LOS) Survey 

BTS integration in BSC. 

Rectification of items outstanding on the snag list. 

Necessary Documentation (Checklist, PAT, Bill of Materials) available at the site and filled up during the installation period. 

Site Access. 

Alarm System and all sensors Installation and commissioning. 

Feeder, antenna, and other relevant equipment testing with customer-in Testing tools and meeting customers’ KPIs. 

Software Loading at BTS & On-site Commissioning. 

Labelling of all cabling and wiring required for BTS equipment. 

Faulty equipment handover.  Preparation of snag list after completion of installation.

Transmission Routing. 

Site Cleaning with a Vacuum cleaner during Installation. 

Equipment Receive at Site. 

Notification of any damage during the equipment receives at the site. 

Ensure quality Installation team. 

Provide standard tools as per the customer's provided list. 

Installation of BTS Cabinet. 

Installation of Power system, Battery, all Indoor cables, groundings, jumpers, and associated BTS peripheral equipment and materials as per the provided layout from the customer. 

Installation of outdoor accessories, Antenna, Feeder Cables, Jumper Cables, groundings, and others as per plan and layout. 

Acceptance test of Service (following Customer’s standard acceptance test procedure).

Production of 'As built' technical documentation required for the finalized implementation of BTS and other equipment. 

Modification of 'As built' technical documentation required for BTS and other equipment following Customer-initiated changes.